• <ol id="tfmrz"><blockquote id="tfmrz"></blockquote></ol>
  • 
    
    <span id="tfmrz"><blockquote id="tfmrz"><nav id="tfmrz"></nav></blockquote></span>

      <strong id="tfmrz"><blockquote id="tfmrz"></blockquote></strong>
    1. <ol id="tfmrz"><output id="tfmrz"></output></ol>
      <optgroup id="tfmrz"><i id="tfmrz"><pre id="tfmrz"></pre></i></optgroup><optgroup id="tfmrz"><em id="tfmrz"><del id="tfmrz"></del></em></optgroup>
      <acronym id="tfmrz"></acronym>
      1. <span id="tfmrz"></span>
          <optgroup id="tfmrz"></optgroup>

          <acronym id="tfmrz"></acronym>

          Set as homepage | Collection | Contact Us | Chinese 
          HOME ABOUT US NEWS EQUIPMENT & FACILITIES PRODUCTS MARKETING NETWORK RECRUITMENT CONTACT US
          News
          Company news
          Industry news
          Links
           · China construction machinery industry association
           · China tendering and bidding network
           · China bidding information network
           · Todays’ engineering machinery
           · DAODA MARINE HEAVY INDUSTRY CO.,LTD
          Company news
          Two shifts for the progress of offshore wind turbine installation vessel in Tongzhou Bay of Nantong

                   Back-pack offshore wind turbine transport installation vessel which is patented vessel for the investor of Chiefnew. This present invention uses the buoyancy of bucket foundation to realize the extensive touch between foundation and vessel, the main parts of the carrying are in water, and with low gravity center, so the transport security is much better. By using the obverse groove to realize three directions’ restraints for the infrastructures which can guarantee the foundation of wind turbine to be synchronized with the hull during floating transportation. By setting door-truss flexible centralizer, rubber cushion flexible restraints and hydraulic jacking system in vessel bow direction, etc to improve the security of the whole transportation, and realize the offshore wind machine be overall contraction and commissioning on land, integration operation of transportation and installation in sea.

                    At present, the first vessel is preliminary shaping, in the process of second deck assembly. In order to catch up the schedule, we started the two shifts in site from 4th Nov, 2015.Day shift:  8:00~11:30; 12:30~17:30; 18:00~21:00;
          Night shift:  21:00~02:00; 03:00~8:00; Chiefnew people are working around the clock……


        1. Previous:China Three Gorges Corporation leadership visited the Wind installation vessel’s manufacturing site at Tongzhou Bay of Nantong City
        2. Next:Chiefnew participated in the 2015 Singapore maritime Asia exhibition during April 20th ~24th, 2015
        3. Chiefnew (Nantong) Heavy Industry Co.,Ltd © Copyright All Right
          Add: No.159, Jianghai Road, NETDA, Nantong, Jiangsu, China.  Zip:226017
          Tel: 0513-85997775  Fax: 0513-85997795  E-mail:chiefnew@126.com

          滬ICP備09019876號

          台湾佬娱乐网22vvvv,综合AV在线高清第一页,国内自拍第1页色爱综合网,国产偷伦视频片免费视频,台湾天天综合娱乐中文网,一级a爱大片夜夜春免费视频,西西人体44rt高清大胆亚洲,欧美性天天影院欧美狂野,一级毛片免费视频全过程